On-site generation
Explore how suitable roof space could generate electricity for your operations.
Agriculture
Put suitable roof space to work around the rhythm of your farm.
Assess my farm →
Agricultural buildings can offer space for solar, but every farm has its own pattern of energy use. Refrigeration, ventilation, equipment and seasonal work should be assessed alongside the condition and construction of the buildings being considered.
Explore how suitable roof space could generate electricity for your operations.
Compare generation with working hours and actual demand.
Include growth, new equipment and changes to your site.
A tailored assessment starts with how your business uses electricity. These are useful areas to discuss:
Review when cooling systems run and how demand changes during the year. Use consumption records to compare operating needs with expected solar generation.
Ventilation and building services can have specific operating requirements. Animal welfare and reliable supply remain central to any system discussion.
Pumping, processing and other equipment may be used intensively for part of the year. Share these seasonal patterns rather than relying only on an annual bill total.
Changes to buildings, equipment or operations can alter demand. Include planned developments and available electrical infrastructure in the project brief.
Bring the building and energy information together before a system is specified. A site review should identify where professional checks or further information are needed.

Tell us about your site and energy use.
Generation and demand do not always align. Compare operating hours, consumption and the proposed solar output before deciding whether storage belongs in the design.
A useful proposal explains capacity, controls and any site constraints. Clarify how the system would operate and who will maintain it.
Explore battery storage →
Compare proposals on their scope and assumptions. Equipment, access, electrical work and the generation your site can use all affect the business case. Ask what is included, what may need further investigation and how future changes have been considered.
Assess the building, roof and energy use. Identify the checks and information required before a design is confirmed.
Review equipment, generation assumptions and how the system fits your operations. Agree responsibilities and any exclusions.
Confirm permissions, grid arrangements, access and programme. Identify planned interruptions and handover requirements.
Yes, it can be considered, but the timing matters. Compare expected generation with monthly and daily consumption, including busy periods and quieter months. The proposal should explain what happens to any surplus and how storage has been assessed.
Discuss its age, condition and any planned repairs before deciding on an installation. Structural suitability, access and the remaining roof life belong in the assessment. Coordinate necessary building work with the proposed solar programme rather than treating them as separate decisions.
The impact depends on access, roof works and electrical arrangements. Ask for a programme that identifies vehicle movements, work areas and any planned power interruptions. Agree how the contractor will coordinate with your site team and operating requirements.
Storage is not necessary for every project. Its suitability depends on when you generate and use electricity, your tariffs and the proposed controls. Compare the assumptions and costs of options with and without a battery before selecting a system.
Recent electricity bills, available half-hourly data, the site address and roof information are useful starting points. Share ownership or lease details, operating hours and planned changes. You do not need a final design before requesting an initial assessment.
Start with your site and energy use. Share recent bills, operating hours and your priorities so the next conversation has a useful starting point.